Wednesday, November 23, 2011

Roller

 Got the front end shortened and the roller on the floor for some eyeball work. Gas and oil tanks need some modifications to the mounts. Seat mounts and fender mounts need added. Stance is good though.
 Took 6 inches out of the front end. Was a bit scared when I looked down the tubes and saw how the axle mount were done. I made the new ones much heavier and they go up the tubes about 4 inches.
Hellybilly truck is a runner but too rich. I'm thinking carb is too big. So, to find a proper carb and do some adjustments.

No comments:

Post a Comment