Sunday, November 13, 2011

More frame fix.

 Slug for backbone fitted and pinned.
 Slugs for downtubes in and pinned,
 Fit and welded. Looks good and will hold forever. All slugs are pinned on each side and Tig welded.
The shovel project. Hard to see the single loop frame. The girder needs shortened about 10 inches. I also changed the gas tank to a different one that I like better.

No comments:

Post a Comment