Single loop on jig for a few little tabs to be removed and a few to be put on.
Another angle of the mock up.
Showing posts with label Building bikes.. Show all posts
Showing posts with label Building bikes.. Show all posts
Sunday, November 20, 2011
Sunday, November 13, 2011
More frame fix.
Slug for backbone fitted and pinned.
Slugs for downtubes in and pinned,
Fit and welded. Looks good and will hold forever. All slugs are pinned on each side and Tig welded.
The shovel project. Hard to see the single loop frame. The girder needs shortened about 10 inches. I also changed the gas tank to a different one that I like better.
Slugs for downtubes in and pinned,
Fit and welded. Looks good and will hold forever. All slugs are pinned on each side and Tig welded.
The shovel project. Hard to see the single loop frame. The girder needs shortened about 10 inches. I also changed the gas tank to a different one that I like better.
Labels:
Building bikes.
Subscribe to:
Posts (Atom)